Solutions

Built around how you build.

Same three layers, same chemistry. What changes is which layers you run, who applies them, and what paper you need at the end. Find your seat below.

General contractors

Two exposures handled while the frame is still open.

Moisture under the plates and fire during construction both happen before drywall. Both can be documented and dealt with then, by the framer you already hired, without adding a trade or a day. You get a report to hand to the building official and to your risk manager.

General contractors
01 — DrJ TER 2504-101
Core
Class A lumber
Spec MFB-34 EPA Safer Choice Fire Retardant treated DF on the package. Arrives stamped.
03 — ASTM G21
Core
Snap-Plate Mold Defender™
Framer rolls the plate line at layout.
02 — ASTM E84 extended
Core
Job-site fire defense
Framer sprays the interior as walls go vertical. We train them.
What you get at close-out
DrJ TER 2504-101 for the building official
ASTM E84 extended and ASTM G21 test data
Application record tied to the jobsite address
Who's doing it
T.R. Wurster Construction, Los Angeles, and NorCal Lumber Company are both running the full program on shared projects.
Fifteen minutes with you and whoever runs your framing.
If it does not fit the way you build, we will tell you so.
Book fifteen minutes