How it works

Fire treated framing that follows your sequence.

Nothing about layout changes. The lumber shows up stamped, the plate line gets rolled before the walls stand, and the interior gets sprayed before windows and mechanicals go in.

01
Before the package ships

Lumber arrives stamped

MFB-34 EPA Safer Choice Fire Retardant treated Douglas Fir leaves the mill code-evaluated and stamped per member. Your crew cuts, nails and hangs it the same way. Bright uncoated steel nails are fine.

DrJ TER 2504-101 · ASTM E84 extended / E2768
Lumber arrives stamped
02
On the deck, at layout

Roll the plate line

Snap your lines as usual. Roll Snap-Plate Mold Defender™ three inches wide of the line and coat the bottom of each plate before the walls are stood. The walls go vertical on the same schedule.

ASTM G21
Roll the plate line
03
As the walls go vertical

Spray the interior lumber

Before windows and mechanicals go in, the framer you already hired sprays the exposed interior lumber with MFB-31 from a backpack or cart rig. We train the crew and set the equipment.

MFB-31 · EPA Safer Choice
Spray the interior lumber
04
At close-out

Hand over the paper

The evaluation report, the test standards behind each layer, and the application record for the address. Something to hand to the building official and to your risk manager.

TER · test reports · application record
Hand over the paper
Snap-Plate Mold Defender™ · field method

Four steps, no change to layout

01
Snap your lines as usual
Nothing about layout changes. The framer works off the same lines.
02
Roll three inches wide of the line
The extra width is what interrupts horizontal moisture movement into the plate.
03
Coat the bottom of each plate
Done on the deck, before the walls are stood.
04
Stand the walls and keep framing
Single application, roller or sprayer. The walls go vertical on the same schedule.
Test standard ASTM G21 Application Roller or sprayer, single coat Where Snapped lines & plate bottoms Sizes 1 · 5 · 55 gallon
FAQ

Questions about the sequence.

When in the framing sequence does each layer happen?
The lumber is treated before the package ships and arrives stamped. The plate line is rolled on the deck at layout, before the walls are stood. The interior is sprayed as the walls go vertical, before windows and mechanicals. The paperwork is handed over at close-out.
Who applies the plate treatment and the spray?
Your framing crew. FireProShop™ trains them, sets the sprayer tips and pressure, and supplies the product. No new trade is added to the site.
Do my framers need a certification?
No. The method is a roller on the plate line and a backpack or cart sprayer on the interior, and FireProShop shows the crew how to do both to the framing date.
What paperwork do I get at close-out?
The DrJ TER 2504-101 evaluation report, the test standards behind each layer (ASTM E84 extended and E2768 for the lumber and spray, ASTM G21 for the plate treatment) and the application record for the address, ready for the building official and your risk manager.